Tuesday 26 May 2015


Refurbishment
For anyone who wants to save the sanity, home refurbishment can be mind-bending thus it’s essential to prepare a blue-print before commencing the renovation process. One must intelligently divide and do the project in stages.

This way will help in climbing the housing ladder in a hassle free way by avoiding any unanticipated jobs and misapprehensions or even damages to already refined parts of the project. One should not coax to precipitate into preparatory work without first taking stock of the structural condition of the house or apartment.

The property refurbishment work is required to be commenced by removing the rubbish and making the work place uncluttered. Here are some tips to initiate the property refurbishment process by usually following the main jobs and dividing the project stages and sequences. Make sure that you hire professional property refurbishment services for the perfect finish.

Start from the plumbing jobs: Commence the project by adding or repositioning the water supply or waste outlets. Also, adjust the central heating by fitting the added points for radiators, etc. For the further project stages, leave the installation of plumbing equipment.

Fix the carpentry jobs: for a new stud partition walls, construct a frame, suspended ceilings and leave the frameworks open for uncomplicated admittance to electrical installations.

Electrical Jobs: Electrical work is mandatory for any project and is required to be carried out with immense intellectual approach. Complete the electrical circuit rewiring, internet installation, Wiring of security system, installation of phone cables, TV, including additional switches and sockets. Initially, work on the electrical mounting boxes, security system with some core motion sensors, window and door magnets and others including- leaving sockets, switches, rest of motion sensors, magnets and other electrical equipment, fixtures installation for future project stages.

• Installation of windows, door frames and window sills
• Onto the partition wall frame and suspended ceiling frame, fix up the plasterboards
• If required then have plastering and dry lining
• Scour the walls and ceilings neatly and strip of any wallpaper
• Repair the cracks, skim the walls and ceilings
• The tiles of the kitchen, bathroom and floor should be grouted in the end and cover the floor tiles with lining paper.
• Get the site of the project dirt-free and neat
• Fix the door architraves, skirting boards, dado rails and any picture
• Carpeting, floor fitting, leaning, leaving over the building materials and removing the rubbish
• Installation of worktops, kitchen cabinets and appliances

For any interior renovation project, given chart is the recommended work sequence, though it may differ slightly from one project specification to another but the process remains to be the same on general basis. When it comes to state work for more than one floor, the yuckiest jobs are to execute the work from top to bottom floors.

Since dust sets down, it takes extra effort to deep clean and organized the other way. Following project plan works efficiently well in reducing the stress and gives you the clear picture of not just the whole project but also helps to control the cost. During renovation, it’s important to have the security on the site to protect the building tools and materials in the night from burglars.
| 6 comments